David Porter, Executive Director of Leach Botanical Gardens, writes:
“The new construction video includes more views from the deck of the Tree walk. The rails and the stainless steel cap on the railing are being installed and polished. Soon the electricians will come in and install lighting. The structure is very aesthetically pleasing.
In the landscape, the secondary paths are taking shape and the irrigation systems are nearing completion in the Gathering Green and Pollinator Garden areas. The Arbor framework is assembled and next steps include pouring of the Terrace and setting the fire feature.
I hope you enjoy the views. I am astonished that this has been the 11th construction video. Time has flown by.
I hope you are safe and well, andI look forward to the day I can greet you in the Garden again.”